CuraFlo’s® certified professionals use specially designed equipment and proven, proprietary processes to clean and then line the inside surface of pipes with a safe, durable epoxy lining. The process of applying our epoxy pipe lining is as follows:
- First, the pipes are dried.
- Then the pipes are cleaned, removing corrosion and other buildup that can impede water flow and affect water quality.
- Finally, an odorless, tasteless and safe epoxy is applied. It becomes a permanent barrier, protecting against future pipe leaks and corrosion.
CuraFlo offers two different technologies to restore pipes:
The CuraFlo Engineered Flow Lining System® for copper or galvanized pipes that are ½” to 4” in diameter. Typically, these are the hot or cold water pipes carrying water throughout a building. Click here to see a demonstration of this process.
The CuraFlo Spincast System™ for metal or cement pipes that are 3” – 36” in diameter. These are often water mains that run underground to feed homes, buildings and fire hydrants. Click here to see a demonstration of this process.